Industrial Perimeter Wall, Kapurthala, Punjab
2 Min Read
38.5 tons
Kapurthala, Punjab
Tags:
Featured
COmpleted

Overview
A 1.8 km wall, built 2.5x faster
ITC Ltd, GreenJams' first industrial customer, needed a secure boundary around newly acquired land in Kapurthala, Punjab. In April 2022 it started a pilot with Agrocrete®. By December 2022, contractor Tricon had built a 1.8 km perimeter wall from 28,000 blocks, about 350 m³ of blockwork. Tricon reported the wall went up 2.5x faster than with the materials it normally uses. The finished wall stores 38.5 tons of CO₂ and came through its first monsoon without damage.

The brief
Secure the site and stay below baseline
A boundary wall of this length is normally built with burnt clay bricks or conventional concrete blocks. Both carry a heavy carbon cost, and both are slow to lay over long distances. ITC set a clear target for the project: bring its emissions below the baseline set for it. The wall also had to be strong enough to secure an industrial site and durable enough to stand through Punjab's monsoon season, year after year.

Why Agrocrete®
Two climate benefits in one block
ITC chose Agrocrete® because it delivers two climate benefits at once. Each block stores carbon inside the wall. And 10 to 15% of each block's weight comes from crop residue such as paddy straw, which in Punjab is often burned in the fields after harvest. Every block uses straw that would otherwise add to that smoke. Agrocrete® is IS 2185 and IS 1725 compliant, so it fitted the project's specifications without special approvals.

What we supplied
28,000 solid blocks for 350 m³ of wall
GreenJams supplied 28,000 Agrocrete® Solid Blocks for the pilot, enough for about 350 m³ of blockwork across the full 1.8 km run. The blocks are made from paddy straw, fly ash and BINDR™, our cement-free binder. Solid blocks are our load-bearing format, rated at 5 MPa or more, which gave the wall the strength an industrial boundary needs. Every block carries a 10-year warranty against cracks, dampness and termites.

On site
Same crews, same tools, faster progress
Tricon laid the blocks with its own crews, its usual tools and standard mortar. There was no special training and no change to the site's working methods. Agrocrete® blocks are larger than bricks, so each course covers more wall with fewer joints to fill. Tricon reported that the wall went up 2.5x faster than with the materials it normally uses. The full 1.8 km was built between April and December 2022.

The results
Through the monsoon without damage
The finished wall came through a full monsoon season with no damage, and it secures ITC's Kapurthala site as planned. ITC now had a working example of low-carbon masonry at industrial scale, delivered faster than its usual approach. The pilot also paid off commercially. In December 2022, ITC started a second, larger wall at Sandila, Uttar Pradesh, using 44,200 Agrocrete® blocks across 2.6 km.

Carbon impact
38.5 tons of CO₂ stored in the wall
The Kapurthala wall stores 38.5 tons of CO₂ in its blockwork. Using crop residue and replacing conventional masonry avoided a further 130.76 tons of emissions. Together, those two effects took the project below the carbon baseline ITC had set for it. For an industrial client, the wall shows that boundary walls, often an afterthought in a capital project, can make a measurable contribution to company emissions targets.