COmpleted

Five-storey white mixed-use building in Vizianagaram, its lower floors built with Agrocrete® Hollow Blocks

Overview

An IT office on 60% less electricity

This five-storey mixed-use building in Vizianagaram spans more than 10,000 sq ft of shops, offices and homes. Its ground and first floors are built with more than 3,000 Agrocrete® Hollow Blocks. One of the tenants on those floors is an IT company running 20-hour shifts in a 2,500 sq ft office. It has seen electricity bills 60% lower, thanks to the thermal insulation of the walls. The blockwork stores about 4 tons of CO₂.

Front view of the completed five-storey mixed-use building in Vizianagaram

The brief

A cooling load that never switches off

Mrs. Neeraja Jami was building the block to house a mix of tenants. An IT company running 20-hour shifts was lined up for the lower floors, which meant its air conditioning would run almost round the clock. Heat coming in through the walls drives a large share of that bill. The owner wanted walls that would keep the office cool and make the space easier to let, without adding cost or slowing the build.

Workers building Agrocrete® Hollow Block walls on an open floor of the Vizianagaram building

Why Agrocrete®

Hollow blocks where heat load is highest

Agrocrete® Hollow Blocks trap air inside the wall, giving up to 3.5x the thermal insulation of conventional masonry. Placing them on the ground and first floors put that insulation exactly where the round-the-clock tenant would sit. The blocks are made from paddy straw, fly ash and BINDR™, our cement-free binder, so the same walls that cut the cooling load also store carbon for the life of the building.

Unplastered Agrocrete® Hollow Block walls enclosing an open floor of the Vizianagaram building

What we supplied

3,000+ hollow blocks for two floors

GreenJams supplied more than 3,000 Agrocrete® Hollow Blocks for the ground and first floors of the building. Hollow blocks are our insulating format, designed as an alternative to AAC and conventional blocks for infill walls in framed buildings like this one. They are lighter to handle than solid concrete blocks and, like all Agrocrete® blocks, carry a 10-year warranty against cracks, dampness and termites.

Open floor of the mixed-use building with Agrocrete® block walls under construction

On site

Standard tools, standard finish

The building's regular masonry crew laid the blocks with standard tools and mortar. Each Agrocrete® block covers far more wall than a brick, so there are fewer units to lay per square metre and fewer joints to fill. Electrical conduits were chased into the blockwork, and the walls were plastered and finished like any other building. Nothing about the site's methods or schedule had to change.

Masons working among stacks of Agrocrete® blocks on the building's first floor

The results

60% lower electricity bills, every month

The 2,500 sq ft IT office on the Agrocrete® floors runs 20-hour shifts and has seen electricity bills 60% lower. For the tenant, that is a saving on every monthly bill for as long as it stays. For the owner, it is a concrete selling point when letting the space to future tenants. The office stays cooler and steadier through the summer, with the air conditioning working less hard.

Bright finished corridor with white walls and a patterned tile floor in the Vizianagaram building

Carbon impact

About 4 tons of CO₂ in two floors

The Agrocrete® blockwork on the ground and first floors stores about 4 tons of CO₂. The building now combines lower operating emissions, from a smaller cooling load, with lower embodied emissions locked into its walls. It shows how a single material choice, made on the floors that matter most, can cut both the running cost and the carbon footprint of a commercial building at the same time.

Explore Agrocrete®

Decorative white breeze-block screen on an upper floor of the completed building

Suggested Case Studies for you

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?