Individual Residence, Rajahmundry, Andhra Pradesh

2 Min Read

3 tons

of CO2 Captured

of CO2 Captured

Rajahmundry, Andhra Pradesh

Tags:

COmpleted

Left and right: two street views of Mr. Raveendra Kumar's three-storey Rajahmundry home with grey and white facade panels

Overview

Half the cement, walls up in 15 days

Mr. Raveendra Kumar, a retired Deputy Chief Engineer of Indian Railways, built his 1,800 sq ft home in Rajahmundry with about 2,000 Agrocrete® blocks. He compared the options before choosing. The result: the entire blockwork was finished in 15 days, the walls used more than 50% less cement and sand, and the home stores about 3 tons of CO₂. His house has since persuaded a second family in the city to build with Agrocrete®.

The Rajahmundry home during construction, wrapped in green safety netting

The brief

An engineer's standard for his own home

After a career on Indian Railways infrastructure, Mr. Kumar wanted his home built from materials that were sustainable and cost-effective, and he wanted evidence rather than marketing. Two things mattered most to him: the cost of the structure and how long it would take to build. Conventional brick walls use a lot of cement and sand in mortar and plaster, and laying them brick by brick is slow work.

Why Agrocrete®

Bigger blocks, fewer joints, less mortar

Agrocrete® blocks are several times the size of a standard brick, so a wall has far fewer joints to fill with mortar. That cuts both material use and laying time. The blocks are IS 2185 and IS 1725 compliant and carry a 10-year warranty against cracks, dampness and termites. For an engineer judging the specification line by line, that combination gave Mr. Kumar the assurance he needed before committing.

Bedroom with built-in white shelving and a large window in the Rajahmundry home

What we supplied

About 2,000 blocks for 1,800 sq ft

GreenJams supplied about 2,000 Agrocrete® blocks for the walls of the 1,800 sq ft house. The blocks are made from paddy straw, fly ash and BINDR™, our cement-free binder, and give up to 3.5x the thermal insulation of conventional walls. Inside, the walls were plastered and finished in white with marble floors. On the street facade, the house was clad in grey and white panels.

Finished room with white walls, marble floor and windows in the Rajahmundry residence

On site

Blockwork finished in just 15 days

Mr. Kumar's masons laid the blocks with their usual tools and methods, with no special training needed. Because each block covers so much more wall than a brick, progress was quick. The entire blockwork for the house was completed in just 15 days. Mr. Kumar singled out the speed of construction as one of the biggest benefits of the project, alongside the savings on cement and sand.

Kitchen with white built-in cabinets and a black granite counter in the finished home

The results

More than 50% saved on cement and sand

The project used more than 50% less cement and sand than conventional masonry, because fewer, larger blocks need far less mortar. The house was completed in April 2024, on a fast schedule and with lower material costs. Its looks, its performance and Mr. Kumar's own feedback then convinced Mr. Abhilash R to build his 2,700 sq ft family home in Rajahmundry with Agrocrete® too.

Carbon impact

About 3 tons of CO₂ in the walls

The walls of the Raveendra Kumar residence store about 3 tons of CO₂. Combined with the cut of more than half in cement and sand, the home has a far lower carbon footprint than a conventional brick house of the same size. It shows that the sustainable choice can also be the efficient one, judged by the standards of an engineer who spent his career building infrastructure.

Explore Agrocrete®

Suggested Case Studies for you

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?