Individual Residence, Rajahmundry, Andhra Pradesh
2 Min Read
3 tons
Rajahmundry, Andhra Pradesh
Tags:
COmpleted

Overview
Half the cement, walls up in 15 days
Mr. Raveendra Kumar, a retired Deputy Chief Engineer of Indian Railways, built his 1,800 sq ft home in Rajahmundry with about 2,000 Agrocrete® blocks. He compared the options before choosing. The result: the entire blockwork was finished in 15 days, the walls used more than 50% less cement and sand, and the home stores about 3 tons of CO₂. His house has since persuaded a second family in the city to build with Agrocrete®.

The brief
An engineer's standard for his own home
After a career on Indian Railways infrastructure, Mr. Kumar wanted his home built from materials that were sustainable and cost-effective, and he wanted evidence rather than marketing. Two things mattered most to him: the cost of the structure and how long it would take to build. Conventional brick walls use a lot of cement and sand in mortar and plaster, and laying them brick by brick is slow work.
Why Agrocrete®
Bigger blocks, fewer joints, less mortar
Agrocrete® blocks are several times the size of a standard brick, so a wall has far fewer joints to fill with mortar. That cuts both material use and laying time. The blocks are IS 2185 and IS 1725 compliant and carry a 10-year warranty against cracks, dampness and termites. For an engineer judging the specification line by line, that combination gave Mr. Kumar the assurance he needed before committing.

What we supplied
About 2,000 blocks for 1,800 sq ft
GreenJams supplied about 2,000 Agrocrete® blocks for the walls of the 1,800 sq ft house. The blocks are made from paddy straw, fly ash and BINDR™, our cement-free binder, and give up to 3.5x the thermal insulation of conventional walls. Inside, the walls were plastered and finished in white with marble floors. On the street facade, the house was clad in grey and white panels.

On site
Blockwork finished in just 15 days
Mr. Kumar's masons laid the blocks with their usual tools and methods, with no special training needed. Because each block covers so much more wall than a brick, progress was quick. The entire blockwork for the house was completed in just 15 days. Mr. Kumar singled out the speed of construction as one of the biggest benefits of the project, alongside the savings on cement and sand.

The results
More than 50% saved on cement and sand
The project used more than 50% less cement and sand than conventional masonry, because fewer, larger blocks need far less mortar. The house was completed in April 2024, on a fast schedule and with lower material costs. Its looks, its performance and Mr. Kumar's own feedback then convinced Mr. Abhilash R to build his 2,700 sq ft family home in Rajahmundry with Agrocrete® too.
Carbon impact
About 3 tons of CO₂ in the walls
The walls of the Raveendra Kumar residence store about 3 tons of CO₂. Combined with the cut of more than half in cement and sand, the home has a far lower carbon footprint than a conventional brick house of the same size. It shows that the sustainable choice can also be the efficient one, judged by the standards of an engineer who spent his career building infrastructure.