Industrial Workshop, Roorkee, Uttarakhand

2 Min Read

3.1 tons

of CO2 Captured

of CO2 Captured

Roorkee, Uttarakhand

Tags:

COmpleted

Single-storey GreenJams workshop in Roorkee with exposed Agrocrete® solid block walls and a green steel door

Overview

Built in 4 days, standing five years on

Before we asked anyone else to build with Agrocrete®, we built with it ourselves. In February 2021, GreenJams completed a 1,100 sq ft load-bearing workshop in Roorkee, Uttarakhand, using Agrocrete® Solid Blocks and no steel. The walls went up in 4 days. More than five years later, the building has been through 2 earthquakes and 3 cyclones, is still in daily use, and stores 3.1 tons of CO₂ in its walls.

Gloved hands setting an Agrocrete® Solid Block in mortar on the Roorkee workshop wall

The brief

Can the blocks carry a building alone?

In 2021 we needed a workshop in Roorkee. We also needed to answer the question every engineer asks about a new material: can it carry a building on its own? Most small industrial sheds in India are built with an RCC frame and brick infill. That means steel, formwork, curing time and a lot of cement. We wanted to show that a building of this size could go up faster, with less material, and still be strong.

A mason standing beside a tall Agrocrete® block wall during construction of the Roorkee workshop

Why Agrocrete®

A block designed to bear loads

Agrocrete® Solid Blocks are our high-strength, load-bearing format, rated at 5 MPa or more and compliant with IS 2185 and IS 1725. They are made from paddy straw, fly ash and BINDR™, our cement-free binder. Building the workshop as load-bearing masonry let the blocks do the structural work, removing the steel frame and the slow pour-and-cure cycle that comes with it.

Two masons laying and levelling Agrocrete® Solid Blocks on the load-bearing workshop wall

The build

A 1,100 sq ft load-bearing structure

We designed a 1,100 sq ft workshop built entirely from Agrocrete® Solid Blocks, without a single piece of steel. The walls carry the roof directly, so there are no columns or beams to cast. The blockwork was left exposed, showing the texture of the blocks and keeping the build simple. A green steel door and small high windows complete a plain, practical industrial building.

Left: workers passing Agrocrete® blocks up the Roorkee workshop wall; right: a worker carrying blocks on his shoulder

On site

Load-bearing walls up in just 4 days

With no frame to cast and no curing time to wait for, the walls went up in 4 days, from first course to finished blockwork. The masons worked with standard tools and mortar. The speed of the build was the first proof point for Agrocrete® in the field: a load-bearing building could be put up in days rather than weeks, with fewer trades on site and less material.

Close-up of an exposed Agrocrete® solid block wall corner at the Roorkee workshop

The results

2 earthquakes and 3 storms later

More than five years on, the workshop is still standing strong. It has been through 2 earthquakes and 3 cyclones without structural damage. The blocks have also proved termite-resistant. The building is still working every day: a plastic manufacturing business uses it today. It remains our oldest Agrocrete® building and the reference we point to when engineers ask about durability.

Carbon impact

Our first carbon-negative building

The Roorkee workshop was GreenJams' first carbon-negative structure. Its walls store 3.1 tons of CO₂, and building without steel or an RCC frame removed two of the most carbon-intensive parts of a conventional workshop. It set the pattern for everything that followed: prove the material on a real building first, then take it to customers. Five years later, that approach still guides how we develop new products.

Explore Agrocrete®

Suggested Case Studies for you

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?

Frequently asked questions

How can we help

with your Project?

How does ordering from GreenJams work?

Tell us your project, the products you need and your programme. We’ll send a like-for-like quote against your current specification, with the embodied-carbon saving in tonnes and a delivery date. Quote a SKU code from our catalogue and we can price and schedule from it directly.

Is there a minimum order quantity?

How quickly can you deliver?

Where do you supply from, and how is delivery charged?

Can I get a sample before I order?

Are your products tested and certified?

Do you provide EPDs and technical data sheets?

Will switching to GreenJams change my design or site work?